Our remote-first future has turned HS2 into a glaring anachronism

0
16


The UK’s High Speed 2 (HS2) rail project has been a bone of contention ever since it was first proposed in 2009.

The new rail line – which is set to run 345 miles between London, Birmingham, Manchester and Leeds – was billed as a means of better connecting the North and South and “levelling up” Britain’s transport infrastructure.



Source link